Difference between revisions of "Projects:Baidu power control"
From IIIS-Systems
Wangguosai (Talk | contribs) (→相关资料) |
Wangguosai (Talk | contribs) (→项目进展) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 16: | Line 16: | ||
= 参与人员 = | = 参与人员 = | ||
− | + | [[User:Wangguosai|王国赛]]†, 王书浩†, 罗冰‡, 施巍松‡, 朱颖航∧, 杨文君∧, 胡殿明∧, 黄隆波†, 金鑫•, [http://iiis.tsinghua.edu.cn/~weixu/ 徐葳]† | |
†Institute for Interdisciplinary Information Sciences, Tsinghua University, China | †Institute for Interdisciplinary Information Sciences, Tsinghua University, China | ||
Line 27: | Line 27: | ||
= 相关资料 = | = 相关资料 = | ||
− | [http://dl.acm.org/citation.cfm?doid=2901318.2901338 Paper/DOI] | + | * 论文:[http://dl.acm.org/citation.cfm?doid=2901318.2901338 Paper/DOI] |
+ | * Slides:[[File:Baidu-power-control.pdf]] | ||
= 项目进展 = | = 项目进展 = | ||
− | + | * 2016年4月19日:Oral presentation at Eurosys 2016. | |
− | + |
Latest revision as of 15:21, 21 November 2016
项目名称
Increasing Large-Scale Data Center Capacity by Statistical Power Control
项目介绍
大规模数据中心的建造、运营成本均很高昂,所以充分利用数据中心的容量,提升计算能力是降低总拥有成本的关键。这项研究提出了一项在数据中心中超额供给功率的方案,从而可以在数据中心总供给功率不变的情况下,通过增加部署17%的服务器,将数据中心整体的任务吞吐量提升15%。
这项研究的创新之处在于:
- 通过统计上地均衡各列的负载,实现了间接的功耗控制,既保证了超额供给不会引发功率超限而跳闸,又避免了使用传统的功耗封顶技术,确保延迟敏感型任务的性能不会受到影响;
- 通过简单的控制模型有效地控制了功耗,并通过周期性的动态控制容忍了控制模型的误差;
- 将功耗控制系统和任务调度器解耦合,仅通过最简单的接口交互,从而避免了对复杂的调度器做进一步修改;
- 通过A/B测试的方式,在数据中心的生产环境中利用真实负载进行了在线的实验测试,既验证了功耗控制策略的有效性,又最小化了实验对真实业务产生的干扰。
参与人员
王国赛†, 王书浩†, 罗冰‡, 施巍松‡, 朱颖航∧, 杨文君∧, 胡殿明∧, 黄隆波†, 金鑫•, 徐葳†
†Institute for Interdisciplinary Information Sciences, Tsinghua University, China
‡Department of Computer Science, Wayne State University, USA
∧Baidu, Inc., China
•Deparement of Computer Science, Princeton University, USA
相关资料
- 论文:Paper/DOI
- Slides:File:Baidu-power-control.pdf
项目进展
- 2016年4月19日:Oral presentation at Eurosys 2016.